The Garage Beam System (GBS) is a complete forming system designed specifically for post-tensioned beam and slab multi-story parking structures. A detailed proposal shows all of the components required, suggested pour sequences, and estimated labor requirements. The complete package includes the necessary beam forms, temporary support, deck panels, formwork handling equipment (gas or electric forklifts) and application instructions for efficient concrete placement.
Long span deck panels allow for wide work spaces for accessibility and forklift mobility
Provides beam form assemblies up to 60’ long, along with column and capital forms
Requires no tie system or additional bracing
Drafted beam sides ease stripping operation and produce a smooth concrete finish